- Half yearly (April-September 2022) EC Compliance report of Proposed Kusmunda Coal Washery of 25 MTPA
- Half Yearly (April 2022 - September 2022) EC compliance report of Kusmunda OCP 50 MTPA (Normative) & 62.50 MTPA (Peak).
- Half Yearly (April 2022 - September 2022) EC compliance report of Dipka Expansion Project, Dipka Area, SECL.
- Half yearly (Period April 2022 to September 2022) compliance of conditions of EC No- J-11015/44/2009-LA II(M) dt.09/02/2011 in respect of Shiwani UG Coal Mine of Bhatgaon Area of M/s SECL [NO-SECL/SHIWANI/ENVT/CM/1071 Date-19/10/2022]
- Implementation status of EC Conditions in respect of Mahan II OCM of M/s SECL, Bhatgaon Area for the period "April 2022 to Sept 2022" [No-SECL/SAM/MAH-II/ENVT/2022/5326 Date-14/12/2022]
- Submission of Six Monthly report of Nawapara UG Mine of M/s SECL Bhatgaon Area (Period April-2022 to Sept-2022) [NO-SECL/BHAT/SAM/KAL/195 Date-21/10/2022]
- EC COMPLIANCE REPORT 06 Monthly Report from April 2022 to Sept. 2022 [No-SECL/MAHAN/ENV-EC/2022/614 Date-21/10/2022]
- Half Yearly (April 2022 to Sept 2022) compliance of conditions of EC No J-11015/1096/2007-IA-II(M) Dated 18.02.2011 in respect of Mahamaya UG Mine of Bhatgaon Area of M/s SECL [NO-SECL/BHAT/SAM/MM/ENV/2022/422 Date-27/10/2022]
- Half Yearly (period April 2022 to September 2022) compliance of conditions of EC No. J-11015/44/2009-LA II(M) dt. 09/02/2011 in respect of Kalyani UG Coal Mine of Bhatgaon Area of M/s SECL [NO-SECL/BHAT/KALYANI/CM/194 Date-21/10/2022]
- Implementation status of environmental clearance conditions in respect of Jagannathpur OC of SECL, Bhatgaon Area as per EC Letter No-J-11015/60/2016-IA.II(M) dated 16.02.2018 [No:SECL/BHAT/SAM/JOCP/ENVT/2022/1293 Date-18/10/2022]
- Half Yearly (Period from April 2022 to Sept 2022) compliance of conditions of EC No-J-11015/8/86 I-A dated 09/07/1986 in respect of Bhatgaon UG Coal Mine of Bhatgaon Area of M/s SECL (NO-SECL/BHAT/SAM/BHAT UG/ENV/2022/434 Date-29/10/2022)
- SIX MONTHLY REPORT OF MONITORING THE IMPLEMENTATION OF ENVIRONMENT SAFE GUARDS FOR THE PERIOD ENDING SEPT 2022 GEVRA OC PROJECT
- Half Yearly EC Compliance report in respect of Gare Palma IV/2&3 OCM and UGM (6.25 MTPA) of SECL, Raigarh Area for the period March 2022 to September 2022
- Half Yearly EC Compliance report in respect of Chhal OCM (3.5 MTPA) of SECL, Raigarh Area for the period Jan 2022 to June 2022
- EC Compliance report in respect of Manikpur OCM (4.90 MTPA) of SECL, Korba Area for the period Oct 2021 to Mar 2022
- Six Monthly Compliance Report for the Period of JANUARY 2022 to JUNE-2022 of Hasdeo Area
- Six Monthly EC Compliance of CHURCHA UG Mine 1.35 MTPA(NORMATIVE)/2.10 MTPA (PEAK),BAIKUNTHPUR AREA (Period- from JANUARY 2022 to JUNE-2022).
- Six Monthly EC Compliance of JHILMILI UG Mine 0.50 MTPA,BAIKUNTHPUR AREA (Period- from JANUARY 2022 to JUNE-2022).
- Six Monthly EC Compliance of KATKONA UG Mine 0.36 MTPA,BAIKUNTHPUR AREA (Period- from JANUARY 2022 to JUNE-2022).
- Six Monthly EC Compliance of PANDAVPARA UG Mine 0.50 MTPA,BAIKUNTHPUR AREA (Period- from JANUARY 2022 to JUNE-2022).
- Half Yearly Compliance Report from October 2021-March 2022 of Kusmunda OCP of 50 MTPA (Normative)/62.5 MTPA (Peak) capacity,Kusmunda Area SECL. (Ref. No: SECL/GM(M)/KOCP/ENV/22-23/660 Date: 31/05/2022)
- Submission of Half Yearly Compliance Report of conditions stipulated in EC of Chirimiri Opencast mine of South Eastern Coalfields Limited, Chirimiri Area for the period 01.01.2022 to 30.06.2022.
- Submission of Half Yearly Compliance Report of conditions stipulated in EC of Chirimiri Underground Coal Mine Project of South Eastern Coalfields Limited, Chirimiri Area for the period 01.01.2022 to 30.06.2022.
- EC compliance report for the half year ending June 2022 for Amadand OCP, SECL
- Submission of Half Yearly Compliance Report of conditions stipulated in EC of mines of South Eastern Coalfields Limited,Kurasia UG Mine (Chirimiri Area) for the period 01.07.2021 to 31.12.2021
- Submission of Half Yearly Compliance Report of conditions stipulated in EC of mines of South Eastern Coalfields Limited, NCPH Colliery (Chirimiri Area) for the period 01.07.2021 to 31.12.2021
- Submission of Half Yearly Compliance Report of conditions stipulated in EC of mines of South Eastern Coalfields Limited, Vijay west UG (Chirimiri Area) for the period 01.07.2021 to 31.12.2021
- Submission of Half Yearly Compliance Report of conditions stipulated in EC of mines of South Eastern Coalfields Limited, Rani Atari UG mine (Chirimiri Area) for the period 01.07.2021 to 31.12.2021
- Half Yearly Compliance of Proposed Kusmunda Washery 25 MTPA for October 2021 - March 2022 [Ref No-SECL/GM(M)/KOCP/ENV/22-23/659 Date-31/05/2022]
- Six Monthly EC Compliance of JAMPALI OCP, SECL Raigarh Area, (JAN 2022 to JUNE 2022)
- Six Monthly EC Compliance of Bijari OCP, SECL Raigarh Area, (Oct 2021 to Mar 2022)
- Six Monthly EC Compliance of Bijari OCP, SECL Raigarh Area, (Apr 2021 to Sep 2021)
- Six Monthly EC Compliance of BAROUD OCP, SECL Raigarh Area, (JULY 2021 to DEC 2021)
- Six Monthly Report fo Monitoring the implementation of Environment Safe Guards for the period ending March 2022 of Gevra Area [No-J-11015/85/2010-IA-II(M) Dated-10/05/2021]
- Six monthly EC Compliance Report of Dipka OCP for the period October 2021 to March 2022 [Ref no-SECL/DIPKA AREA/ENVIRONMENT/2022/2619 Date-25/05/2022]
- Six Monthly EC Compliance of Khairaha UG Coal Mine SECL Sohagpur Area, Dhanpuri (October 2021-March 2022)
- Compliance Status of EC Conditions for Dhanpuri OC Mine of Sohagpur Area (July 2021 to Dec 2021) [SECL/SGP/ENVT/22/09 Date-19/04/2022]
- Six Monthly EC Compliance of Damini UG Coal Mine, SECL Sohagpur Area, Dhanpuri (July 2021-December 2021)
- Six Monthly Environmental Clearance compliance of Amlai OC Sec B Mine-11015/36/2010-IA.II(M), Dated-28/06/2011 [SECL/SGP/ENVT/22/08 Dated-28/06/2011]
- Sharda OC EC Compliance as on 31/12/2021
- Rajendra UG Project, SECL Sohagpur Area EC No-J-11015/64/2005-IA-II(M), Dtd-24th may 2005
- Compliance/Non Compliance of EC Condition Navgaon UG Project, SECL, Sohagpur Area EC No-J-11015/12/91-1A-II(N), Dtd-26th March 1993
- Six Monthly EC Compliance of Bangwar UG Coal Mine SECL Sohagpur Area, Dhanpur (July 2021- December 2021)
- Six Monthly Report on compliance of Environment Clearance Pandavpara UG Coal Mine 0.50 MTPA (Period-From July 2021 To December-2021) Baikunthpur Area
- Six Monthly Report on compliance of Environment Clearance Katkona UG Coal Mine 0.36 MTPA (Period-From July 2021 To December-2021) Baikunthpur Area
- Six Monthly Report on compliance of Environment Clearance Jhilimili UG Coal Mine (RO) 0.50 MTPA (Period-From July 2021 To December-2021) Baikunthpur Area
- Six Monthly Report on compliance of Environment Clearance Churcha UG Coal Mine (RO) 1.35 MTPA (Normative)/2.10 MTPA (Peak) (Period-From July 2021 to December-2021) Baikunthpur Area
- Half Yearly compliance Report of conditions stipulated in EC of Chirimiri OC Mines of SECL, Chirimiri Area for the period 01.07.2021 to 31.12.2021 [Ref No-SECL/GM/CHRM/Envt./22/309 Date-25/02/2022]
- Half Yearly Compliance Report of conditions stipulated in EC of Chirimiri UG coal mine project of SECL, Chirimiri Area for the period 01.07.2021 to 31.12.2021 [Ref No-SECL/GM/CHRM/Envt./22/308 Date-25/02/2022]
- Sharda OCM (Highwall) EC Compliance as on 30.06.2021
- Compliance/Non Compliance of EC Condition Navgaon UG Project, SECL Sohagpur Area EC No-J-11015/12/91-IA-II(N) Dtd.26th March 1993
- Compliance status of EC conditions Dhanpuri OCM, SECL, Sohagpur Area No-J-11015/36/2010-IA.II(M) Dated.28/06/2011
- Six Monthly EC Compliance (January 21 to June 21) Daminin UG Mine EC No-J-11015/47/2002-IA,II(M) Dated-05th October 2004
- Compliance/Non Compliance of EC Condition Navagaon UG Project, SECL Sohagpur Area EC No-J-11015/12/91-IA-II(N), Dtd.26th March 1993
- Compliance status of EC Condition Khairaha UG Project, SECL, Sohagpur Area (J-11015/72/2004-IA-II(M) dated-11.01.2019) Production capacity: 0.819 MTPA Mining Area:472.065 MTP
- EC Compliance Report Bangwar UG Project EC No: J-11015/69/82-RN.5, Dated-24th may 1985
- Rajendra UG Project, SECL Sohagpur Area EC No-J-11015/64/2005-IA-II(M), Dtd.24th may 2005
- Six Monthly Compliance Status (January 2021 to June 2021) Compliance/Non-compliance Status of Environmental clearance condition 28.09.2021 Amlai OC sec-B, SECL, Sohagpur area No. J-11015/36/2010-IA.II(M) Dated-28/06/2011
- Six Monthly EC Compliance Report of Dipka OCP-35 MTY (April'21 to Sept'21)
- Half Yearly Compliance of EC of Kusmunda OCP 50.00 MTPA (Normative)/62.5 MTPA (PEAK) (Period-From April to September 2021)
- Submission of Half Yearly Compliance of the stipulated Environmental Clearance conditions from April-September 2021 in respect of Proposed Kusmunda Coal Washery Project of 25 MTPA capacity in area of 41.23 ha of M/s SECL located in village Durpa & Jarhajel, Tehsil Katghora, District Korba, CG
- Environmental Clearance (EC) of Kanchan OC Expansion from 0.65/ 0.75 MTPA (Normative/Peak) to 2.0 MTPA (Peak) in area of 749.31 ha by M/s SECL in village Ghughuli
- Half yearly EC Compliance status report period ending June 2021, Churcha RO UG Mine, Baikunthpur Area
- Half yearly EC Compliance status report period ending June 2021, Jhilimili UG Mine, Baikunthpur Area
- Half yearly EC Compliance status report period ending June 2021, Katkona UG Mine, Baikunthpur Area
- Half yearly EC Compliance status report period ending June 2021, Pandavpara UG Mine, Baikunthpur Area
- Submission of half-yearly EC Compliance report in respect of Korba Area for the period Jan 2021-Jun2021
- Submission of half-yearly EC Compliance report in respect of Saraipali OCM (1.40 MTPA) of SECL, Korba Area for the period Jan 2021-Jun2021 [No-SECL/KB/SRPL/SAM/2021-22/1632 Date-08/08/2021]
- Submission of half-yearly EC Compliance report in respect of Singhali UG Coal Mine (0.42 MTPA) of SECL, Korba Area for the period Jan-Jun 2021 [No-SECL/DSB-SA/SAM/2021/381 Date-31/07/2021]
- Submission of half-yearly EC Compliance report in respect of Rajgamar UG Coal Mine (0.45 MTPA) of SECL, Korba Area for the period Jan'21-Jun'21 [No-SECL/RAJ./SAM/ENVT./358 Date-26/07/2021]
- Submission of half-yearly EC Compliance report in respect of Bagdeva UG Coal Mine (0.76 MTPA) of SECL, Korba Area for the period Jan-Jun 2021 [No-SECL/DSB-SA/SAM/2021/382 Date-31/07/2021]
- Submission of Half Yearly compliance Report of conditions stipulated in EC of Chirimiri OC Mine of SECL, Chirimiri Area for the period 01/01/2021 to 30/06/2021 [Ref No-SECL/GM/CHRM/Envt./21/220 Date-10/08/2021]
- Submission of Half Yearly Compliance Report of conditions stipulated in EC of Chirimiri UG Coal Mine Project of SECL, Chirimiri Area for the period of 01/01/2021 to 30/06/2021 [Ref No-SECL/GM/CHRM/Envt./21/219 Date-10/08/2021]
- Half yearly EC Compliance Report of Kusmunda OCP from October2020-March 2021(Ref No-SECL/GM(M)/KSM/21-22/428 Date-27/05/2021)
- Implementation of Half Yearly Compliance/ Environment Safe Guard 'for the period ending March 2021 in respect of Gare Palma IV/1 OC Mine' (Ref No-SECL/SAM/Gare/Envt/Safeguard/21-22/ Date-01/05/2021)
- Half Yearly EC Compliance report of Gare Pelma IV/2&3 OC (6.25 MTY)of SECL Raigarh Area for the period from Oct 2020 to March 2021 (Ref No-SECL/GM/RGH/(Envt.& Forest.)/2021/38 Date-11/06/2021)
- Gevra OCP: 6 Monthly Report on EC Condition Compliance period ending June 2021
- Implementation status of EC Conditions in respect of Jagannathpur OC project of M/s SECL, Bhatgaon Area for the period OCT 2020 to March 2021 (No-SECL/BHAT/SAM/JOCP/ENVT/2021/174 Date-01/06/2021)
- Implementation stauts of EC Conditions in respect of Mahan II OCM of M/s SECL, Bhatgaon Area for the period Oct 2020 to March 2021 (No-SECL/BHAT/MAHAN/ENVT/20-21/1405 Date-24/05/2021)
- EC Report of Mahan OCM, Bhatgaon Area (No-SECL/MAHAN/ENV-EC/2021/266 Date-18/05/2021)
- Half Yearly (Period Oct 2020 to March 2021) compliance of conditions of EC No. J-110015/44/2009-LA II(M) dt.09/02/2011 in respect of Shiwani UG Coal Mine of Bhatgaon Area of M/s SECL, a subsidiary of CIL (No-SECL/SHIVANI/ENVT/CM/468 Date-14/06/2021)
- Submission of Six Monthly report in respect of Nawapara UG Mine of M/s SECL Ltd. Bhatgaon Area (Period OCT 2020 to March 2021) (No-SECL/BHAT/CM/603 Date-10/06/2021)
- Half yearly (Period October 2020 to March 2021) compliance of conditions of EC No J-11015/44/2009-LA II(M) dt.09/02/2011 in respect of Kalyani UG Coal Mine of Bhatgaon Area of M/s SECL, a subsidiary of CIL (No-SECL/BHAT/KALYANI/CM/120 Date-22/06/2021)
- Implementation status of EC Conditions in respect of Mahamaya UG Mine of M/s SECL, Bhatgaon Area (For the period from OCT 2020 to March 2021) (No-SECL/CM/MM/ENVT/2021/107 Date-18/06/2021)
- Half yearly (period from OCT 2020 to March 2021) compliance of conditions of EC No. J-11015/8/86 I-A dated 09/07/1986, in respect Bhatgaon UG Mine of Bhatgaon Area M/s SECL (No-SAM/BSA/Bhat-UG/ENV/2021/35 Date-24/04/2021)
- (Ref No-428 Date-27/05/2021)
- Submission of six monthly (OCT 2020-March 2021) EC Compliance report of Dipka Expansion Project, Dipka Area, SECL (Ref No-SECL/DPK AREA/ENVIRONMENT/2021/2259 Date-26/05/2021)
- Half Yearly Compliance of Kusmunda Washery 25 MTPA for October 2020-March 2021
- Half Yearly Compliance of Kusmunda Coal Washery 25 MTPA for Apr-Sept 2020
- Half Yearly EC compliance report for quarter ending June 2020 of Jampali OCP SECL Raigarh Area
- Half Yearly EC compliance report for quarter ending Sep 2020 of Gare Pelma IV-1 of SECL Raigarh Area
- Half Yearly EC compliance report for quarter ending Sep 2020 of Gare Pelma IV-2&3 of SECL Raigarh Area
- Half Yearly EC compliance report for quarter ending June 2020 of Chhal OCP SECL Raigarh Area
- Submission of Half Yearly compliance Report of conditions stipulated in EC of Vijay West UG Coal Mine Project of SECL, Chirimir Area for the period of 01/07/2020 to 31/12/2020 (Ref No-SECL/GM/CHRM/Envt./21/166 Date-21/02/2021)
- Submission of Half Yearly compliance Report of conditions stipulated in EC of Rani Atari UG Coal Mine Project of SECL, Chirimiri Area for the period 01/07/2020 to 31/12/2020 (Ref No-SECL/GM/CHRM/Envt./21/165 Date-21/02/2021)
- Submission of Half Yearly Compliance Report of conditions stipulated in EC of NCPH Colliery UG Coal Mine Project of SECL Chirimiri Area for the period 01/07/2020 to 31/12/2020 (Ref No-SECL/GM/CHRM/Envt./21/164 Date-21/02/2021)
- Submission of Half Yearly compliance Report of conditions stipulated in EC of Kurasia UG Coal Mine Project of SECL Chrimiri Area for the period 01/07/2020 to 31/12/2020 (Ref No-SECL/GM/CHRM/Envt/21/163 Date-21/02/2021)
- Half Yearly (Period April 2020 to Sept 2020) compliance of conditions of EC No: J-11015/44/2009-LA II(M) Dt-09/02/2011 in respect of Shiwani UG Coal Mine of Bhatgaon Area of M/s SECL (No-SECL/SHIVANI/ENVT/CM/3533 Date-19/02/2021)
- EC Compliance of Sharda OCM (Highwall) as on 20/02/2021
- Six Monthly report in respect of Pandavpara UG Mine, Baikunthpur Area for the period ending Dec 2020 [No: J-11015/230/2007-IA.11(M) Dt-04/05/2009]
- Six Monthly report in respect of Nawapara UG Mine of M/s SECL Bhatgaon Area, Period April 2020 to Sept 2020 (No-SECL/BHAT/NWP/CM/1985 Date-18/02/2021)
- Compliance Status of EC Condition as on date 01/07/2017 Rajendra UG Project, SECL, Sohagpur Area [EC No: J-11015/64/2005-IA-II(M) dtd-24/05/2005]
- Compliance/ Non Compliance of EC Condition Navagaon UG Project, SECL, Sohagpur Area [EC No- J-11015/12/91-1A-II(N), Dt-26/03/1993]
- EC Complinace Report Mahan OCM, Bhatgaon Area (No-SECL/MAHAN/ENV-EC/2021/1313 Dt-20/02/2021)
- Implementation status of EC conditions in respect of Mahan II OCM of M/s SECL, Bhatgaon Area (Period April 2020 to Sept 2020) [No-SECL/BHAT/SAM/MAHAN/ENVT/20-21/1021 Date-17/02/2021]
- Implementation status of EC conditions of Mahamaya UG Mine of M/s SECL, Bhatgaon Area (period April 2020 to Sept 2020) [No-SECL/MM/ENVT/CM/20/177 Date-30/12/2020]
- EC Complinace Report Khairaha UG Mine, Sohagpur Area [J-11015/72/2004-IA-II(M) Dt-11/01/2019]
- Six Monthly Report of compliance of conditions stipulated in EC for period ending Dec 2020, Katkona UG Mine [No: J-11015/2019/2005-IA,II(M) Dt-20/06/2006]
- Half Yearly Compliance report of Kalyani UG Coal Mine of Bhatgaon Area of M/s SECL, for the period April 2020 to Sept 2020 (No-SECL/BHAT/KALYANI/CM/465 Date-19/02/2021)
- Implementation status of EC Conditions in respect of Jagannathpur OC Project of M/s SECL, Bhatgaon Area, for the period from April 2020 to Sept 2020.
- Half Yearly EC Compliance Status Report period Ending DEC 2020 Jhilimili UG Mine (No: J-11015/229/2007-IA.11(M) Dated-15/04/2009]
- Compliance Status of EC in respect of M/s Rajnagar RO UG mine project of Rajnagar RO Sub Area, From Jul 2020 to Dec 2020 (No-DYGM(M)/SAM,RAJ.RO/EC/376 Date-20/02/2021)
- Half Yearly EC Compliance Report of Jhiria UG from Jul 2020 to Dec 2020 [No: J-11015/13/2002-IA-II(M) Dated-04/10/2004]
- Half Yearly EC Compliance Report of Jampali OCP (3 MTY), Raigarh Area, for the period Ending Dec 2020
- Half Yearly Compliance report for the period Ending Sept 2020 in respect of Gare Palma IV/2&3 Mine, Raigarh Area (Ref No-SECL/SAM/Gare/Envt/Safeguard/20-21/16548 Date-10/10/2020)
- Half Yearly Compliance report for the period Ending Sept 2020 in respect of Gare Palma IV/I Mine, Raigarh Area (Ref No-SECL/SAM/Gare/Envt/Safeguard/20-21/16547 Date-10/10/2020)
- Half Yearly EC Compliance Status report of Bijuri UG Coal Mining Project (For the period from Jul 2020 to Dec 2020) [No: J-11015/63/2005-IA-II(M) Dated-24/05/2005]
- Half Yearly Status Report of EC Compliance Baherabandh UG Mine for the period from July 2020 to Dec 2020 [No: J-11015/688/2007-IA-II(M) Dated-19/05/2009]
- Six Monthly EC Compliance Report Dhanpuri OC Mine, SECL, Sohagpur Area (Period: July 2020 to Dec 2020)
- EC Report Damini UG Mine [No: J-11015/47/2002-IA,II(M) Dated-05/12/2004]
- Six Monthly Report on Compliance Conditions Stipulated in EC for Period Ending Dec 2020, Churcha RO UG Mine, SECL-Baikunthpur Area (No-J-11105/301/2009-IA-II(M) Dated-03/05/2012)
- Half Yearly (Period from April 2020 to Sept 2020) Compliance of conditions of EC No: J-11015/8/86 I-A dated-09/07/1986 in respect Bhatgaon UG Mine of Bhatgaon Area of M/s SECL (No-SAM/BSA/BHAT-UG/ENV/2020/475 Date-27/12/2020)
- Six Monthly EC Compliance Report Amlai OC Sec B Mine SECL, Sohagpur Area (Period: July 2020 to DEC 2020)
- Submission of Half Yearly EC Compliance report for the half year ending period of Rajnagar OC, SECL, Hasdeo area (July 2020 to Dec 2020) (No-SAM/ROC/C/19-20/357 Date-20/02/2021)
- Submission of Six Monthly Compliance Report of EC of Chhal OCP (3.5 MTY) issued by MOEF, Govt. of India,New Delhi for Half Year Ending Dec 2020 (Ref No-SECL/RGH/SAM/CSA/2021/3456 Date-20/02/2021)
- Six Monthly Compliance Report of EC in respect of Sheetaldhara-Kurja & Kapildhara Group of UG Mines from July 2020 to Dec 2020 (No-SAM/KSA/ENVT/20-21/60 Date-05/02/2021)
- Six Monthly Compliance report to the conditions stipulated in the Environment Clearance granted by MOEF for Pinoura UG Coal Mine (0.79 MTY) for the period of 01/07/2020 to 31/12/2020 (EC granted vide no. J-11015/39/2001-IA-II(M) dated-08/06/2004)
- Six Monthly Compliance report to the conditions stipulated in the Environment Clearance granted by MOEF for Umaria UG Coal Mine (0.35 MTY) for the period of 01/07/2020 to 31/12/2020 (EC granted vide no. J-11015/90/2005-IA-II(M) dated 20/05/2005)
- Compliance Status of EC of Dec 2020 in respect of M/s Haldibari UG Mine of Jhagrakhand Sub-Area, SECL Hasdeo Area (No-SECL/SAM/JKD/2020-21/126-29 Date-05/01/2021)
- Compliance Status of EC of Dec 2020 in respect of M/s West JKD UG mine Jhagrakhand Sub-Area, SECL Hasdeo Area (Ref No-SECL/SAM/JKD/2020-21/130-133 Date-05/01/2021)
- 6 Monthly Compliance report to the conditions stipulated in the EC granted by MOEF for Vindhya UG Coal Mine (0.705 MTY) for the period of 01/07/2020 to 31/12/2020 (EC granted vide No J-11015/20/2001-1A-II(M) dated-18/02/2005)
- 6 Monthly Compliance report of the conditions stipulated in the EC granted by MOEF for Kanchan OC Mine (0.75 MTY) for the period of 01/07/2020 to 31/12/2020 (EC granted vide no J-11015/574/2007-IA-II(M) dated 29/03/2010) (No-SECL/JOH/Envt/20-21/150 Date-19/02/2021)
- Status of Implementation of Environment Safeguards Six Monthly monitoring report (July 2020-Dec2020)of Rehar UG Mine
- Implementation status of EC condition of Amgaon OC project (1.0 MTPA in an ML area of 801.22ha) of M/s SECL Bishrampur Area located in Village-Amgaon, Tehsil-Surajpur, Distt-Surajpur, CG as per MOEF Letter No-j-11015/403/2008-1a-II(M) Dated 02/07/2009 half yearly up to Nov 2020 (No-SAM/BSPR/18/Envt/Amgaon OC/2021/1004 Date-19/02/2021)
- Six Monthly Implementation report of EC period Jun 2020 to Nov 2020 in respect of Amera OCP coal project of M/s SECL, Bishrampur Area (No-SAM/AMERA/2021/8850 Date-07/01/2021)
- Submission of Half Yearly Compliance Report of condition stipulated in EC of Chirimiri OC of SECL Chirmiri Area for the period 01/07/2020 to 31/12/2020 (Ref No-SECL/GM/CHRM/Envt/21/162 Date-19/02/2021)
- Submission of Half Yearly Compliance Report of conditions stipulated in EC of Chirimiri UG Coal Mine Project of SECL Chirimiri Area for the period 01/07/2020 to 31/12/2020 (No-SECL/GM/CHRM/Envt/21/161 Date-19/02/2021)
- Submission of half-yearly EC Compliance report in respect of Manikpur OCM (4.90 MTPA) of SECL, Korba Area for the period Apr'20-Sep'20 (No-SECL/KB/MKP/GM(M)/2020/1188 Date-23/11/2020)
- Submission of half-yearly EC Compliance report in respect of Saraipali OCM (1.40 MTPA) of SECL, Korba Area for the period Jul'20-Dec'20 (No-SECL/KB/SRPL/SAM/2021/1103 Date-23/01/2020)
- Submission of half-yearly EC Compliance report in respect of Rajgamar UG Coal Mine (0.45 MTPA) of SECL, Korba Area for the period Jul'20-Dec'20 (No-SECL/RAJ./SAM/ENVT/2020-21/4845 Date-13/01/2021)
- Submission of "EMP" compliance status report of Jamuna UG Mine of Jamuna UGRO Sub Area, Jamuna Kotma Area, SECL for the period ending September 2020 (No-SECL/SAM/JUGSA/2020/864 Date-01/12/2020)
- Submission of Half-Yearly EC Compliance report in respect of Singhali UG Coal Mine (0.42 MTPA) of SECL, Korba Area for the period Jul'20-Dec'20 (No-SECL/DSB.SA/SAM/ENVT/21/1188 Date-28/01/2021)
- Submission of Half-Yearly EC Compliance report in respect of Dhelwadih UG Coal Mine (0.33 MTPA) of SECL, Korba Area for the period Jul'20-Dec'20 (No-SECL/DSB.SA/SAM/ENVT/21/1187 Date-28/01/2021)
- Six Monthly EC Compliance Report Manikpur OCM (4.90 MTPA), Korba Area for the period of April-Sept 2020
- Six Monthly EC Compliance Report Kumda, Bishrampur Area for the period of June-Nov 2020
- Environmental Clearance Conditions in respect of Gayatri UG Mine, Bishrampur Area
- Environment Clearance report of Amadand OC (2.15 MTY) for the period Ending Sept 2020, Jammuna Kotma Area
- Submission of half-yearly EC Compliance report in respect of Bagdeva UG Coal Mine (0.76 MTPA) of SECL, Korba Area for the period Jul-Dec 2020 (No-SECL/DSB.SA/SAM/ENVT/21/1186 Date-28/01/2021)
- Six Monthly EC Compliance Report, June 2020-Nov 2020 Balrampur Mines, Bishrampur Area
- Submission of Half Yearly Compliance report of the conditions stipulated in the Environmental Clearance of Amadand Bartarai UG, Jammuna Kotma Area for the period ending September 2020
- Half Yearly Compliance of the stipulated Environmental Clearance conditions, from April to September 2020 in respect of Kusmunda OCP [Capacity:50.00 MTPA (Normative)/62.5 MTPA (peak)], SECL Kusmunda Area (Ref No-SECL/GM(M)/KSM/4009 Date-01/12/2020)
- Submission of six monthly (April 2020 to September 2020) EC compliance report of Dipka Expansion Project, Dipka Area, SECL (Ref No-SECL/ENVT/2020/2047 Date-06/11/2020)
- Six Monthly Report of Monitoring the implementation of Environment Safe Guards for the period ending September 2020, for Gevra OC
- Six Monthly Report of Pandavapar UG Mine, Baikunthpur Area, for period Ending June 2020
- Six Monthly Report of Katkona UG Mine, Baikunthpur Area, for period Ending June 2020
- Half Yearly EC Compliance Status report period ending June 2020, Jhilimili UG Mine, Baikunthpur Area
- Environmental Clearance ending June 2020 Churcha RO UG Mine, SECL Baikunthpur Area
- Six Monthly Compliance Report for the Period of 01st Oct 2019 to 31st March 2020 of Bhatgaon Area
- Half yearly Compliance report of Kusmunda OCP 50.00 MTPA (Normative)/62.5 MTPA (PEAK) (PERIOD-FROM OCT 2019-MARCH 2020)
- Six Monthly Report of Monitoring the implementation of Environment safe guards for the period of October 2019 to March 2020
- EC of Amadand OC Project (2.15 MTY) J&K Area for the period Ending March 2020
- Six Monthly Compliance Report for the period ending March 2020, Gevra Area
- EC Compliance Status Report of December 2019 (Haldibari UGM,Jhagrakhand Sub-Area,Hasdeo area)
- Half Yearly EC Compliance Status Report period July 2019 to December 2019 (Jagannathpur OCM,Bhatgaon area)
- Half Yearly EC Compliance Status Report period July 2019 to December 2019 (Jagannathpur OCM,Bhatgaon area)
- Half Yearly EC Compliance Status Report period June 2019 to November 2019 (Amera OCP,Bishrampur area)
- Half Yearly EC Compliance Status Report period Ending Dec-2019 (Pandavpara UG Mine)
- Six Monthly Report on compliance of conditions stipulated in Environmental Clearance for period ending Dec-2019(Katkona UG Mine)
- Half Yearly EC Compliance Status Report period Ending December 2019 (Jhilimili UG Mine)
- Six Monthly Report on Compliance of condition Stipulated in Environmental Clearance for Period Ending Dec-2019 (Churcha RO UG Mine, Baikunthpur)
- Submission of half-yearly compliance report of EC conditions in respect of Bagdeva UG Mine (0.76 MTPA) of SECL, Korba Area for the period Jun-Nov'19 (No-SECL/DSB/1343 Date-14/01/02020)
- Submission of half-yearly, compliance report of EC conditions in respect of Manikpur OC (4.9 MTPA) of SECL, Korba Area for the period Jun-Nov'19 (No-SECL/KB/MKP/GM(M)/2019/1587 Date-31/01/2019)
- EC Compliance Report of Dipka Expansion Project (March 2019 to September 2019)
- Half Yearly Compliance of Kusmunda OCP from April-September 2019
- EC Compliance Report for Half yearly ending June 2019 Chhal OC SECl Raigarh Area_out
- EC Compliance Report for Half yearly ending June 2019 Baroud SECL Raigarh Area
- EC Compliance Report for Half yearly ending June 2019 Gare Pelma IV-1 SECL Raigarh Area
- EC Compliance Report for Half yearly ending June 2019 Jampali SECL Raigarh Area
- EC Compliance Report for Half yearly from April 19 to Sep 19 Gare Pelma IV23 OC SECL Raigarh Area
- Status Of Implementation Of Environmental Safeguards Six Monthly Monitoring Report Ending June-2019, Churcha RO UG Mine, Baikunthpur Area
- EMP Implementation Status Report Half Yearly Ending On June, 2019, Jhilimili UG Mine, Baikunthpur, SECL
- Six Monthly EMP Implementation Status Report Ending On June 2019, Katkona UG Mine, Baikunthpur Area, SECL
- EMP Implementation Status Report Half Yearly Ending June 2019,Pandavpara UG Mine, Baikunthpur, SECL
- Half Yearly Environment Clearance Compliance Report of Gare IV/2 and IV/3 opencast and underground Coal Mining Project of combined production of 6.25 MTPA in an ML area 964.65 ha for the period of April 2019 to September 2019 (Ref No-SECL/BSP/SAM/GP-IV/2&3/EC Compl/2019/13367 Date-06/10/2019)
- Environment Compliance Report of Amadand OC (2.15 MTY) J&K Area for the Period Ending September 2019
- Six Monthly EC Compliance Report of Khairaha UG Mine, Sohagpur Area
- Six Monthly Report Of Monitoring The implementation of Environment Safe Guards For Period Ending September 2019 of Gevra OC Project
- Submission of Half Yearly Compliance Report of conditions stipulated in EC of NCPH Colliery Underground Coal Mine Expansion Project of SECL for the period of 01.01.2019 to 30.06.2019(Ref No-SECL/GM/CHRM/P&P/19/922 Date-15/10/2019)
- Submission of Half Yearly Compliance Report of conditions stipulated in EC of Rani Atari Underground Coal Mine Expansion Project of SECL Chirimiri Area for the period 01.01.2019 to 30.06.2019(Ref No-SECL/GM/CHRM/P&P/19/924 Date-15/10/2019)
- Submission of Half Yearly Compliance Report of conditions stipulated in EC of Chirimiri Opencast Mine of SECL for the period of 01.01.2019 to 30.06.2019(Ref No-SECL/GM/CHRM/P&P/19/874(A) Date-21/08/2019)
- EC COMPLIANCE REPORTS HALF YEARLY AS ON 31 DEC 2018
- BHATGAON UG
- MAHAMAYA UG
- KALYANI UG
- SHIVANI UG
- NAWAPARA UG
- MAHAN OCM
- MAHAN II OCM
- DUGGA OCM
- JAGANNATHPUR OCM
- Submission of half-yearly compliance report of the EC accorded to Manikpur OCM of SECL, Korba Area for 4.90 MTPA, for the period December 2018-May 2019(Ref No:-SECL/BSP/KB/MKP/GM(M)/2019/848 Date-22/07/2019)
- Half Yearly compliance report of Bagdewa UG on implementation of the condition stipulated in the EC letter No J-11015/1099/2007-IA.II(M) Dated-15.07.2009 for the period ending June 2019
- Submission of six monthly (October 2018 to March 2019) EC compliance report of Dipka Expansion Project, Dipka Area, SECL(Ref No-SECL/DA/ENVT/2019/1500 Date-31/05/2019)
- Submission of Six Monthly Compliance Report for the period October 2018 to March 2019 of DANKUNI Coal Complex
- Half yearly Compliance report of Kusmunda OCP 40.00 MTPA capacity
- Six Monthly Compliance Report for the period October 2018 to March 2019 (Notice No-SECL/DCC/12/19-20/Env/MoEF&CC/60 Date-29/05/2019)
- Six Monthly Compliance Report for the Period ending March 2019 of Gevra Area.
- EC letter of Manikpur OCM Expansion 3.5 MTPA to 4.90MTPA
- Six Monthly Compliance Report for the Period of April-September 2018 of Gevra Area.
- Submission of Six Monthly Compliance Report for the period April 2018 to September 2018 Dankuni Coal Complex (DCC)
- Half Yearly Compliance 36.00 MTY for the period of Apr-Sept 2018 of Kusmunda Area
- EC COMPLIANCE REPORTS OF GEVRA OCP FOR THE PERIOD ENDING MARCH 2018
- EC COMPLIANCE REPORTS OF KUSMUNDA OCP FOR JAN-JUNE 2018
- Six Monthly Compliance Report of LTC Plant of SECL/Coal India Ltd. Dankuni Coal Complex
- EC COMPLIANCE REPORTS OF KUSMUNDA OCP FOR JULY-DEC 2017
EC COMPLIANCE REPORTS HALF YEARLY AS ON 30th June 2017
EC COMPLIANCE HALF YEARLY REPORT FOR THE PERIOD ENDING December 2016 EC COMPLIANCE REPORTS HALF YEARLY AS ON 31st Dec 2016 EC COMPLIANCE FOR THE PERIOD OF APRIL 2016 TO SEPTEMBER 2016 EC COMPLIANCE REPORTS HALF YEARLY AS ON 30th JUNE 2016 EC COMPLIANCE HALF YEARLY REPORT FOR THE PERIOD ENDING MARCH 2016- JAMUNA KOTMA AREA